Adidas running build

Starting from top to bottom you might get the feeling of this thing growing as the differences in each image become apparent. Completetion being at the bottom of the page.

the backsprayed Perspex affair was meant to be red as it was always going to be hot. Flames would be CGI'd in later. For speed, most bits were cable-tied on and the basic structure

is white ABS 2mm wrapped around plywood rings. This part was a solo effort. about 7 days flat out. Then I moved onto the front end and put all the rivets on, made the flaps and the ribs, which Mike put on, on set.

 

This site is hosted by Vision Internet Services